October 2009


Foxton Road UID in Ward End, Birmingham for Severn Trent Water is a £2.7m project to provide significant water quality and aesthetic improvements to local watercourses. The scheme provides detention tank storage for storm events and a screened overflow for consented spills to a nearby brook course. Due to the very poor ground conditions the storage tank is being constructed as a secant piled circular cofferdam with 72 nr x 18m long x 900mm dia secant piles (male/female) at an internal diameter of 13m. This is followed by creation of a 5m deep jet grouted ‘base’ at a depth of 13m to 18m. Following completion of the jet grouting, internal excavation of the shaft will be completed and a reinforced concrete base slab constructed which will be dowelled into the piles. The Internal segmental shaft and pre-cast roof slab will then be completed to form final pumping station.
  • ISO 9001, 14001, 45001
  • Investors in People
  • Achilles UVDB (Utilities Vendor database) and ‘Verify’ audit
  • Achilles Building Confidence
  • Member of CECA Midlands Region The Civil Engineering Contractors Association
  • CHAS Contractors Health & Safety Scheme
  • Construction-line
  • SAFEcontractor
  • Member of the BDA British Drilling Association
  • Social Mobility Pledge
  • Women into Construction
  • Real Living Wage
  • Science Based Target Initiative