November 2014
We have secured a re-sewerage contract for MWH as part of their non-infrastructure framework contract with Severn Trent water. The Asfordby Pumping Station to Melton Treatment Works scheme involves installing 3000m of 315mm rising main using open cut, trenching and directional drilling techniques and includes 2 drilled river crossings. The contract is due to commence at the end of November 14 with a programme period of 12 weeks.