February 2017


We are currently undertaking 5 drainage renewal schemes in Highways England Area 7 (East Midlands), the schemes involve a range of drainage activities including; ditch clearance, gulley renewal, pipe repairs,
surface water pipelines and manholes as well as filter drain stone replacement and recycling. The schemes are; A5 Lindley Lodge and A5 River Swift (nr Athestone), A1 Barrowby, A45 Wilby Way – Barnes Interchange,
and A5 Willey Headwall. Extensive traffic management is required for each scheme with much of the work being undertaken at night.
  • ISO 9001, 14001, 45001
  • Investors in People
  • Achilles UVDB (Utilities Vendor database) and ‘Verify’ audit
  • Achilles Building Confidence
  • Member of CECA Midlands Region The Civil Engineering Contractors Association
  • CHAS Contractors Health & Safety Scheme
  • Construction-line
  • SAFEcontractor
  • Member of the BDA British Drilling Association
  • Social Mobility Pledge
  • Women into Construction
  • Real Living Wage
  • Science Based Target Initiative