Windfarms

We provide a range of services for windfarm developments including;


 

  • ‘Design and build’ for wind farm infrastructure, SUD’s drainage and turbine foundations
  • A complete ‘balance of plant’ capability
  • Project management of windfarm developments including;
  • design management
  • preparation or review of the Construction Method Statement (CMS) including environmental, hydrological and ecological considerations, Health and Safety and build procedures
  • site investigation
  • design review and value engineering
  • budget costing and programming
  • stakeholder management
  • site supervision
  • Renewable Energy Director Greg Bradley has unrivalled experience in this field following successfully delivery of over 10 windfarms in Northern Ireland and the Republic of Ireland.

Current Wind Farm Projects -

Roos Wind Farm Nr Hull, East Yorkshire Renewable Energy Systems (RES). Civil and Infrastructure Works for the 9 turbine site commenced on 9th January 2012 requiring construction of 4.5km of site roads, 9 crane hardstandings and turbine bases and a control building. The site has very poor ground conditions which will require extensive ground improvement and deep CFA piling to 5 of the turbine bases.


Wadlow Wind Farm, West Wratting, Cambridgeshire for Renewable Energy Systems (RES).
The Civil and Infrastructure Works for the 13 turbine site commenced on 7th June 2011 and includes 8km of site roads, crane pads and reinforced concrete foundations for the 13 nr 2MW wind turbines. The site is due to be commissioned in September 2012. See below link for the newsletter produced by RES for the project.

 

Wadlow Wind Farm Project Profile

 

Wadlow Wind Farm Initial Newsletter